Critical Path Methods in Construction Practice 4e

Specificaties
Gebonden, 448 blz. | Engels
John Wiley & Sons | 4e druk, 1990
ISBN13: 9780471620570
Rubricering
John Wiley & Sons 4e druk, 1990 9780471620570
Verwachte levertijd ongeveer 9 werkdagen

Samenvatting

An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics––the stress here is on the solution of problems commonly encountered in construction practice.

Specificaties

ISBN13:9780471620570
Taal:Engels
Bindwijze:gebonden
Aantal pagina's:448
Druk:4

Inhoudsopgave

Critical Path Method Procedures and Terminology.
<br />
<br /> The Network Diagram and Utility Data.
<br />
<br /> Network Calculations I: Critical Paths and Floats.
<br />
<br /> Network Calculations II: Simple Compression.
<br />
<br /> Network Calculations III: Complex Compression and Decompression.
<br />
<br /> Network Calculations IV: Scheduling and Resource Leveling.
<br />
<br /> Practical Planning with Critical Path Methods.
<br />
<br /> Project Control with Critical Path Methods.
<br />
<br /> Financial Planning and Cost Control.
<br />
<br /> Evaluation of Work Changes and Delays.
<br />
<br /> Attitudes, Responsibilities, and Duties.
<br />
<br /> Computer–Aided CPM.
<br />
<br /> Selection of Technique.
<br />
<br /> Integrated Project Development and Management.
<br />
<br /> CPM, a Systems Concept.
<br />
<br /> Appendices.
<br />
<br /> Index.

Rubrieken

    Personen

      Trefwoorden

        Critical Path Methods in Construction Practice 4e