<p style="MARGIN: 0px">(Total Level Hours: 185)</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34201-11 Boiler Systems and Components (22.5 Hours)</p> <p style="MARGIN: 0px">Introduces the trainee to different boiler configurations and applications. Identifies different boiler components and</p> <p style="MARGIN: 0px">explains their functions.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34202-11 Identifying and Installing Valves (20 Hours)</p> <p style="MARGIN: 0px">Identifies and explains different types of valves found in boiler systems. Identifies valve components and explains their</p> <p style="MARGIN: 0px">functions. Explains how to select, store, handle, and install valves. Also explains how to interpret valve markings and</p> <p style="MARGIN: 0px">nameplate information found on valves.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34203-11 Pipe Hangers and Supports (25 Hours)</p> <p style="MARGIN: 0px">Identifies pipe hangers and supports found on the job. Explains how to read and interpret pipe support drawings and symbols.</p> <p style="MARGIN: 0px">Explains how to select, store, handle, install, and maintain spring can supports.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px"></p> <p style="MARGIN: 0px"></p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34204-11 Drawings and Detail Sheets (15 Hours)</p> <p style="MARGIN: 0px">Explains how to read blueprints or drawings and their symbols. Explains plot plans, structural drawings, elevation</p> <p style="MARGIN: 0px">drawings, as-built drawings, equipment arrangement drawings, P&IDs, isometric drawings, spool sheets, detail sheets, and</p> <p style="MARGIN: 0px">orthographic drawings.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34205-11 Fasteners and Anchors (5 Hours)</p> <p style="MARGIN: 0px">Covers threaded and non-threaded fasteners and anchoring devices. Explains how to select fasteners and anchors for given</p> <p style="MARGIN: 0px">applications. Describes and explains how to install threaded, non-threaded, and insulated fasteners and anchors.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34206-11 Welding Symbols (5 Hours)</p> <p style="MARGIN: 0px">Explains the different parts of a welding symbol and how to read symbols on welding drawings, specifications, and welding</p> <p style="MARGIN: 0px">procedure specifications. Describes the symbols for fillet welds, groove welds, miscellaneous other welds, and non-destructive</p> <p style="MARGIN: 0px">tests.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px">34207-11 Socket Weld Pipe Fabrication (25 Hours)</p> <p style="MARGIN: 0px">Identifies and explains different types of socket weld piping materials and fittings. Explains how to read socket weld piping</p> <p style="MARGIN: 0px">drawings. Explains how to determine pipe lengths between socket weld fittings, as well as how to mate socket weld</p> <p style="MARGIN: 0px">fittings to pipe.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34208-11 Butt Weld Pipe Fabrication (40 Hours)</p> <p style="MARGIN: 0px">Covers preparing pipe ends for butt welding; determining pipe lengths between butt weld fittings; and using welding jigs to</p> <p style="MARGIN: 0px">align pipe and butt weld fittings for welding. Explains how to select and install backing rings.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34209-11 Tube Weld Preparation and Fitting (15 Hours)</p> <p style="MARGIN: 0px">Describes the various methods used to gain access to boiler tubes needing repair, as well as the methods used to prepare</p> <p style="MARGIN: 0px">boiler tubes for replacement. Explains how to fit-up a section of boiler tube. Describes welding procedures for making butt</p> <p style="MARGIN: 0px">welds on standard carbon steel tubes and composite tubes.</p> <p style="MARGIN: 0px"> </p> <p style="MARGIN: 0px; mso-pagination: none; mso-layout-grid-align: none" sonormal="">34210-11 Arc Carbon Arc Cutting and Gouging (12.5 Hours)</p> <p style="MARGIN: 0px">Describes air carbon arc cutting (CAC-A) equipment and processes. Explains how to select and install CAC-A electrodes</p> <p style="MARGIN: 0px">and how to prepare work area and CAC-A equipment for safe operation. Also provides instructions for using CAC-A equipment</p> <p style="MARGIN: 0px">for washing and gouging activities.</p> <p style="MARGIN: 0px"> </p>