<br>Foreword</br><br>Preface</br><br>List of Figures</br><br>List of Tables</br><br>1 Before You Begin</br><br> 1.1 Introduction</br><br> 1.2 Standards</br><br> 1.2.1 Standard Drawings</br><br> 1.2.2 Charts</br><br> 1.2.3 Drawing Templates and Drawing Standards</br><br> 1.2.4 Drawing Numbering</br><br> 1.2.5 3-D Model Numbering</br><br> 1.2.6 Material Commodity Codes</br><br> 1.3 Specifications</br><br> 1.3.1 Piping Classes</br><br> 1.4 Procedures</br><br> 1.4.1 Stick Files</br><br> 1.4.2 Inter-discipline Drawing Reviews</br><br> 1.4.3 Line Numbering</br><br> 1.4.4 Stress Analysis</br><br> 1.4.5 CAD Set-up</br><br> 1.4.6 3-D Model Reviews</br><br> 1.4.7 Checking</br><br> 1.4.8 Manhour Estimating</br><br> 1.4.9 Progress Reporting</br><br> 1.4.10 Management of Change</br><br> 1.4.11 As-Builting</br><br> 1.4.12 Project Close-out</br><br> 1.5 Piping Execution Plan</br><br> 1.5.1 Design Basis Memorandum (DBM)</br><br> 1.5.2 Project Execution Plan (PEP)</br><br> 1.5.3 Contracting and Procurement Plan and Construction Execution Plan</br><br> 1.6 Conclusion</br><br>2 Procedures</br><br> 2.1 Introduction</br><br> 2.2 Master Stick Files, Working Copies, and Inter-Discipline Drawing Reviews (IDR)</br><br> 2.2.1 Master Stick Files</br><br> 2.2.2 Working Copies</br><br> 2.2.3 Inter-Discipline Drawing Reviews</br><br> 2.3 Vendor Drawing Reviews</br><br> 2.4 Line Numbering</br><br> 2.4.1 Line Numbering Rules</br><br> 2.5 Stress Analysis</br><br> 2.5.1 The Stress Analysis Procedure</br><br> 2.5.2 Stress Analysis Procedure Notes</br><br> 2.6 Model Reviews</br><br> 2.6.1 Model Review Procedure</br><br> 2.6.2 Model Review Matrix</br><br> 2.7 Checking</br><br> 2.7.1 Clash Check Reporting Procedure</br><br> 2.7.2 Equipment Checking Procedure</br><br> 2.7.3 Piping Arrangement and Isometric Checking</br><br> 2.7.4 Prerequisites and Checking Procedure</br><br> 2.8 Manhour Estimating and Manpower Planning</br><br> 2.8.1 Manhour Estimating</br><br> 2.8.2 Manpower Planning</br><br> 2.8.3 Other Considerations</br><br>3 Deliverables</br><br> 3.1 Introduction</br><br> 3.2 Deliverables</br><br> 3.2.1 Cover Sheets and Drawing Indexes</br><br> 3.2.2 Plot Plan</br><br> 3.2.3 Key Plans</br><br> 3.2.4 Location Plans</br><br> 3.2.5 Piping Arrangements</br><br> 3.2.6 Isometrics</br><br> 3.2.7 Isometric Logs</br><br> 3.2.8 Tie-in Isometrics</br><br> 3.2.9 Tie-in List</br><br> 3.2.10 Demolition Drawings</br><br> 3.2.11 Heat Tracing Circuit Layouts</br><br> 3.2.12 Heat Tracing Logs</br><br> 3.2.13 3-D Models</br><br> 3.2.14 Model Indexes</br><br> 3.2.15 CWP Drawing Packages and Scopes of Work (SOW)</br><br> 3.2.16 Process Flow Diagrams (PFDs)</br><br> 3.2.17 Piping and Instrumentation Diagrams (P&IDs)</br><br> 3.2.18 Line Designation Tables (LDTs)</br><br>4 Detailed Design</br><br> 4.1 Introduction</br><br> 4.2 Contracting and Procurement Plan and Construction Execution Plan</br><br> 4.3 Modularized and Field Erected Piping Splits and CWP Boundaries</br><br> 4.3.1 Notes to Figure 4–1</br><br> 4.4 Model Boundaries</br><br> 4.4.1 Study Model Boundaries</br><br> 4.4.2 Detailed Model Boundaries</br><br> 4.5 Shop and Field Material Splits</br><br> 4.6 Procurement Splits</br><br> 4.7 Issued For Bid and Bid Evaluations</br><br> 4.7.1 Issued for Bid</br><br> 4.7.2 Clarifications from Bidders and Bid Evaluations</br><br> 4.8 Equipment Coordinates and Elevations</br><br> 4.9 Module Design</br><br> 4.9.1 Design Considerations</br><br> 4.10 Module Numbering</br><br> 4.11 Drafting Practice</br><br> 4.11.1 A Brief History</br><br> 4.11.2 3-D CAD Drafting Practice</br><br> 4.11.3 Ownership and Training</br><br> 4.11.4 Piping Arrangements</br><br> 4.11.5 Isometrics</br><br> 4.12 Holds</br><br> 4.13 Project Binders and Lists</br><br> 4.13.1 Project Binders</br><br> 4.13.2 Piping Job Notes and CAD Job Notes</br><br> 4.13.3 Action Item List and Needs List</br><br> 4.13.4 Equipment List</br><br> 4.13.5 Data Sheets</br><br> 4.14 Managing Standard Drawings</br><br> 4.15 Project Meetings</br><br> 4.16 Progress Monitoring</br><br> 4.17 Design Change Notice (DCN)</br><br> 4.18 Field Change Notice (FCN)</br><br> 4.19 Request For Information (RFI)</br><br>5 Shop Fabrication</br><br> 5.1 Introduction</br><br> 5.2 Kick-off Meetings</br><br> 5.3 Scopes of Work (SOW)</br><br> 5.3.1 Example of Pipe Spool Fabrication Scope of Work</br><br> 5.3.2 Example of Module Fabrication and Assembly Scope of Work</br><br> 5.4 Instruction to the Fabricator</br><br> 5.4.1 Example of Instruction to Fabricator</br><br> 5.5 Requests For Information (RFI)</br><br> 5.6 Visits with the Fabricators</br><br> 5.6.1 The Value of Shop Visits</br><br> 5.6.2 Supporting the Fabricators</br><br> 5.7 Automatic Spool Generation</br><br> 5.8 Conclusion</br><br>6 Field Construction</br><br> 6.1 Introduction</br><br> 6.2 Support from the Home Office</br><br> 6.2.1 Kick-off Meetings</br><br> 6.2.2 Field Erection of Piping Scope of Work</br><br> 6.2.3 Computers, 3-D Software Set-ups, and Maintenance</br><br> 6.2.4 Request for Information</br><br> 6.3 Support in the Field</br><br> 6.3.1 Utilizing the 3-D Models</br><br> 6.3.2 Problem Solving</br><br> 6.3.3 Punch Lists and Deficiency Reports</br><br> 6.3.4 Compiling and Submitting RFIs</br><br> 6.3.5 Investigating Back Charges and Extras</br><br> 6.3.6 Progress Monitoring</br><br> 6.3.7 Maintaining the Master Stick Files</br><br> 6.3.8 As-Builting</br><br> 6.4 Lessons Learned</br><br> 6.5 Safety</br><br>Abbreviations</br><br>Index</br>